Trip in Tow

Inspection of towing vessel and barge(s) to determine the suitability for the intended tow                    

Vessel condition survey

Bollard pull

Compliance with regulatory and class requirements, as appropriate

 

Review of vessel documentation, certification and periodic

inspections 

Including Planned Preventative Maintenance (PPM) program to confirm up to date.

Fuel and water capacities are sufficient for the planned voyage with a safety factor.

 

Inspection and review of        

Navigation and communication equipment, weather routing, safety, lifesaving and firefighting capabilities, propulsion, tow wires, winches and jewelry inventory with usage logs and SWL certifications, and Merchant Marine Certificates (MMC)


Cargo Survey (Pre-load/departure condition)


Lashing and securement of cargo on deck


Tow Letter prior to departure


  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
Share by: